Monday 12 February 2007

State watch

Murray Valley Standard
Thursday 8/2/2007 Page: 9

SA WIND POWER: South Australia's latest wind farm will be connected to the state's electricity network by ElectraNet. ElectraNet is to construct and operate a new 132,000 volt substation and a 2.5 kilometre transmission line from the windfarm to the existing 132,000 volt Bungama-Hummocks transmission line. The wind farm will produce sufficient electricity to power about 60,000 households.

0 comments: